Object ID: BIND68
To the Centre : 2000 м
City/District : Mersin / Teje
To the Beach: 1000 м
Rooms :
Building Delivery Date : 2023-12-30
Balcony : 1
Area : 100m² - 120m²
Floor : 13
View: Hasn,t View
Social Areas
- Pool
- Gym
- Sauna
- Turkish Bath
- Child Playground
- BBQ
- Camelia
- Green Аrea
- Walking Area
Advantages
- Carpark
- Generator
- Concierge
- Security
- Elevator
- Parking Garage
About Project
Our new complex is located in the province of Mersin, the center of which is one of the largest port cities in Turkey, receiving ships from hundreds of international ports and therefore open for business and trade. Thanks to the mild climate, the holiday season here lasts from mid-April to mid-November. In the center there is a magnificent embankment for walking, which can safely be called one of the best embankments in Turkey. Right on this embankment is the famous Marina - a yacht anchorage and a recreation and shopping area that is so loved by locals and foreigners.
A first-class residence with a rich infrastructure Mersin/Tece
PROJECT FEATURES and LOCATION:
The complex is located in one of the most convenient areas of Mersin, Mezitli / Tece, with close access to both the sea with beautiful beaches and the very center of Mersin. Nearby there is all the necessary urban infrastructure: cafes, restaurants, bars, shops, shopping centers, hospitals, pharmacies, parks, banks, public transport stops.
1500m2 – green area, 300m2 – swimming pool, 800m2 – covered parking
General characteristics:
Central heating system
Heat-resistant BIMS blocks are used
Intelligent elevator system
Fire detector inside a building
Complete generator
TYPES OF APARTMENTS:
apartments 3+1 - 120m2
apartments 2+1 - 100m2
APARTMENT FEATURES:
Suspended ceiling
Kitchen cabinets
Wardrobe
Bathroom cabinets
Kitchen countertops
Steel entrance door
PVC windows
Imported silicone based paint
Plumbing 1st class
Laminate 10 mm
Glass balcony partitions
INFRASTRUCTURE FEATURES:
Open pool
Open parking
Closed parking
Sauna
Hammam
Sports grounds
Children playground
BBQ and relaxation area
COMPLETION DATE: 12/30/2023